Document Description Due Date
SOW •  Statement of Work (grant proposal)
•  MSD sheets
October 10th, 2005
PDR •  Preliminary Design Review (rough design) December 7th, 2005
CDR •  Critical Design Review (fine-tuned design)
•  CDR Presentation
February 7th, 2006
FRR •  Flight Readiness Report (finished and tested design)
•  FRR Presentation
•  Mission Facts Sheet
•  Checklists
April 7th, 2006
FR •  Final Report (experiment results and flight report) May 26th, 2006
NOTE for the team members:The NASA requirements for the documents are in the Library section under "Document Requirements" heading.